IT change management basics: how to make changes without breaking things

What IT change management is, the three types of change, what a change request should hold, how approvals and freeze periods work, and how to start small.

QVS Solutions LLC · · 7 min read

Many outages start with a planned change: a firmware upgrade, a moved cable, a configuration tweak that seemed harmless. Change management is the habit of planning those changes, checking what they could affect, getting a second pair of eyes on them, and recording what was done.

It doesn’t have to mean meetings and paperwork for every small thing. This guide covers the types of change, what a good change request holds, how approvals work, and how to start with a process your team will actually follow.

What counts as a change

A change is anything that adds, modifies or removes something your services depend on, for example:

  • upgrading firmware or an operating system
  • moving, replacing or re-cabling a server or switch
  • changing a firewall rule, network setting or application configuration
  • retiring equipment that something might still use

Fixing a broken item back to how it was is usually a repair (a work order), not a change. The line is about whether the way things are set up changes.

The three types of change

Common frameworks, such as ITIL, sort changes into three types:

What it isHow it’s approvedExample
StandardLow-risk, routine, done the same way every timePre-approved: once the procedure is agreed, each one goes ahead when it’s loggedAdding memory to a server using a documented procedure
NormalAnything that isn’t standard or emergencyReviewed and approved before work startsUpgrading a core switch’s firmware
EmergencyNeeded right away to fix or prevent a serious problemDone first if necessary, then reviewed and approved afterApplying an urgent security patch

Most of the value comes from getting normal changes right, and from moving routine work into standard so it doesn’t wait for approval.

What a change request should hold

A useful change request answers the questions a reviewer would ask:

  • What and why: what’s changing, and the reason
  • Which items: the servers, devices, applications or services it touches
  • When: the planned start and end, ideally in an agreed maintenance window
  • Who: the person doing the work
  • Risk and impact: what could go wrong, and what depends on the items
  • Test plan: how you’ll know it worked
  • Backout plan: how you’ll undo it if it doesn’t

If you can’t write a backout plan, that’s worth knowing before you start, not after.

Knowing what a change could affect

The hardest question in a change review is “what else depends on this?” A switch might carry the storage network for three applications; a UPS might power the rack that runs your phone system.

Recording relationships between items (this application runs on that server, which is powered by that UPS) lets reviewers see the impact before approving, instead of finding it during the outage. Even a partial map of your most important services helps.

Approvals

A few rules keep approvals meaningful without slowing everything down:

  • Someone else approves. The person who asks for a change shouldn’t approve it.
  • Match the review to the risk. Standard changes need no review each time; high-impact normal changes may need more than one approver, or a change advisory board (CAB) for the biggest ones.
  • Check for clashes. Two changes to the same items in the same window are a common cause of trouble.
  • Close emergencies properly. An emergency change still gets reviewed and recorded after the fact.

Freeze periods

A freeze (sometimes called a blackout) is a period when non-emergency changes stop, such as during a major go-live, a peak season or year-end close. Publish freezes in advance so people can plan around them, and keep a path for genuine emergencies.

After the change

When the work is done:

  1. Test it against the plan.
  2. Record the outcome: completed, completed with problems, or backed out.
  3. Update your records so they match what’s now in place.
  4. Review failures: a change that caused an incident is worth a short look at what the review missed.

Over time, comparing your records with how things actually are shows drift: changes that happened without a change request. Each one is a gap in the process worth closing.

Starting small

You don’t need a full process on day one:

  1. Start with your most critical services and the equipment they depend on.
  2. Require a change request with a backout plan, and a different approver, for changes to those items.
  3. Turn your most common routine changes into standard changes.
  4. Add freeze periods for your busiest times.
  5. Widen the scope once the habit sticks.